06/15/2023 - Construction Update

Work Completed between 06/08/23 and 06/14/23:

Sewer:

  • Finalized all connections

Dry Utilities:

  • Continued work on the Joint Utility Trench (JUT) and signal connections

Concrete Curb, Gutter, and Sidewalks:

  • Demolition and grading in preparation of pouring of sidewalks

06/12/23 - Mayor Kathy Hayden on site holding conduit for the Joint Utility Trench (JUT).

06/13/23 - Front of the Dairy Freeze after the asphalt was removed to prepare for the construction of new sidewalks.



Work in Progress this Week between 06/15/23 and 06/21/23:

Dry Utilities:

  • Finalize JUT and signal connections
  • Installation of temporary signal pole to allow for space for the new signal base
  • Pouring bases for new signal poles

Concrete Curb, Gutter, and Sidewalks:

  • Finalize demolition of sidewalks
  • Staking of sidewalk locations
  • Pouring of sidewalks

Upcoming Work between 06/22/23 and 06/28/23:

Concrete Curb, Gutter, and Sidewalks:

  • Continuation of sidewalk pouring
Categories: Construction Update