10/24/22 Construction Update
Work completed for Week Ending 10/21/2022:
- Kincaid Avenue (Maple to Main)
- Water Testing
- Complete subgrade preparation and place/compact gravel
- Kincaid Avenue (Academy to Maple)
- Water Testing
- Install rebar over watermain trenches and prepare for concrete pours.
- Academy Street (Kincaid to Alder)
- Water Testing
- Install rebar over watermain trenches and prepare for concrete pours.
10/17/22: Grading on Kincaid Avenue south of Main Street.
10/18/22: Grading on Kincaid Avenue north of Maple Street
10/19/22: Place rock on Kincaid Avenue between Main Street and Maple Street
10/20/22: Compacting rock on Kincaid Avenue south of Main Street
10/21/22: Placing temporary asphalt on Kincaid Avenue south of Maple Street
Work in progress this week (10/24/2022 - 10/28/2022):
- Kincaid Avenue (Academy to Maple)
- Pour concrete over watermain trenches.
- Place asphalt over watermain trenches.
- Kincaid Avenue (Park to Academy)
- Water Testing
- Kincaid Avenue (south of Park)
- Water Testing
- Academy Street (Kincaid to Alder)
- Pour concrete over watermain trenches.
- Place asphalt over watermain trenches.
- Park Street (Kincaid to Alder)
- Water Testing
Upcoming Work through 11/11/2022:
- Kincaid Avenue (Maple to Main):
- Begin illumination system.
- Begin irrigation system.
- Kincaid Avenue (Academy to Maple):
- Continue water service connections.
- Kincaid Avenue/Academy Street Intersection
- Demolition for storm drainage installation.
- Install storm drainage pipes and structures.
- Grade for concrete placement.
- Kincaid Avenue (Park to Academy)
- Continue water service connections.
- Water Testing
- Pour concrete and place asphalt over waterline trenches.
- Kincaid Avenue (south of Park to tie-in)
- Continue water service connections.
- Water Testing
- Pour concrete and place asphalt over waterline trenches.
- Park Street (Kincaid to Alder)
- Continue water service connections.
- Water Testing
- Pour concrete and place asphalt over waterline trenches.
